Product Description
Introducing the Rapid Gravity Prototyping High Pressure Die Casting Machine by Guangzhou Chuang Li You Machinery Co., Ltd. This top-tier machine excels in wire rope die casting, brake wire die casting, and zinc head die casting. Perfectly suited for small-scale die casting projects and expert wire rope patterning, it's commonly utilized in the production of pendant lamps, brake wires, and various spreaders.
Key Features:
- Exceptional zinc head die casting capability
- Perfect for small die casting, ideal for intricate projects
- Versatile wire rope patterning for multiple applications
- Operates at an approximate pressure of 15 bars
- Supports a weight capacity of up to 200g
- Adheres to high safety standards for secure operation
- Rapid casting speed ensures efficient production
- Produces minimal burr for exceptionally smooth finishes
- High efficiency with convenient and fast output
Additional Information:
- Comes with a 1-year machine warranty for peace of mind
- Offers training through comprehensive video tutorials and online guidance
- Ensures stable machine performance for consistent results
- Simple operation ensures a user-friendly experience
- Equipped with a mechanical arm for enhanced functionality
Product Description
Company Name: Guangzhou Chuang Li You Machinery Co., Ltd.
Machine Specifications:
- Machine Dimensions (L*W*H): 1.5m * 0.9m * 1.8m
- Full Action Cycle Time: 5 seconds
- Comes with a new set of die-casting molds
Method Usage Considerations:
- Power Supply: Three-phase four-wire, Voltage: 380V / 50Hz, Voltage Fluctuation: ±10%
- Control Voltage: DC24V
Before Installing, Operating, and Maintaining:
Read the instruction manual thoroughly to ensure proper usage. Pay close attention to safety information and equipment notes before commencing operation.
Environment Restrictions:
- Avoid placement in areas exposed to direct sunlight, extreme temperatures, corrosive or flammable gases, dust, or water splashes.
- Implement shielding measures in environments with static electricity, strong electric/magnetic fields, or radiation exposure.
Power On Precautions:
- Ensure no wiring debris, verify correct power supply wiring, and securely tighten all screws.
- Only trained personnel should operate the equipment. Safety protection devices must always remain intact.
Maintenance Guidelines:
- Lubricate and clean the linear guide rail on a weekly basis.
- Regularly inspect and tighten all fastening parts to prevent loosening due to vibrations or temperature changes.
Strictly adhere to all safety protocols and avoid unauthorized adjustments. Disconnect all power sources before installation or maintenance to prevent electric shock or product damage.

