Product Description
Unveiling the Rapid Gravity Prototyping High Pressure Die Casting Machine, brought to you by Guangzhou Chuang Li You Machinery Co., Ltd. This advanced machine is expertly engineered for wire rope die casting, brake wire die casting, and zinc head die casting. It excels in small die casting projects and wire rope patterning, making it an ideal choice for applications such as pendant lamps, brake wires, and various spreaders.
Key Features:
- Exceptional zinc head die casting capability
- Precision casting for intricate small-scale projects
- Versatile wire rope patterning for diverse applications
- Optimal operating pressure at approximately 15 bars
- Robust weight capacity of up to 200g
- High safety standards ensuring secure operation
- Rapid casting speed for increased production efficiency
- Minimal burr production for smooth, high-quality finishes
- High efficiency with quick and convenient output
Additional Information:
- 1-year comprehensive machine warranty for your peace of mind
- Extensive training available via video tutorials and online guidance
- Stable machine performance delivering consistent and reliable results
- User-friendly operation for ease of use
- Equipped with a high-functionality mechanical arm
Product Description
Company Name: Guangzhou Chuang Li You Machinery Co., Ltd.
Machine Specifications:
- Machine Dimensions (L, W, H): 1.5 * 0.9 * 1.8 meters
- Complete Machine Cycle Time: 5 seconds
- New machine includes a set of die-casting molds
Method Usage Considerations:
- Power Supply Voltage: Three-phase four-wire, 380V / 50Hz, Voltage Fluctuation Range ± 10%
- Control Voltage: Direct Current 24V
Before Installing, Operating, and Maintaining:
Thoroughly read the instruction manual and accompanying materials for correct usage. Familiarize yourself with all safety information and equipment notes before using the machine.
Environment Restrictions:
- Do not set up the machine in areas exposed to direct sunlight, extreme temperatures, corrosive or flammable gases, dust, or water splashes.
- Implement shielding measures in environments with static electricity, strong electric or magnetic fields, or radiation exposure.
Power On Precautions:
- Ensure no wiring debris, verify correct power supply wiring, and securely tighten screws.
- Only trained personnel should operate the equipment, and all safety protection devices must remain intact.
Maintenance Guidelines:
- Lubricate and clean the linear guide rail on a weekly basis.
- Regularly check and tighten fastening parts to prevent loosening caused by vibration or temperature changes.
Always adhere to safety protocols and avoid unauthorized adjustments to prevent unpredictable consequences. Disconnect all power sources before installation or maintenance to prevent electric shock or product damage.






